logo

CICWCD WIP Eightmile Hills Concrete Tank

Sector: Government • Location: Cedar City, Utah, United States of America

Source: Dodge USA

Project
Closed

Construction of a 4 MG AWWA D115 tendon pre-stressed concrete tank; Construction of a CMU building; Site work and electrical improvements.

Status
Closed
Sector
Government, Metal, Commercial, Power Generation (CCGT), Residential, Manufacturing (Industrial), Cement
Location
Cedar City, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CICWCD WIP Eightmile Hills Concrete Tank

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CICWCD WIP Eightmile Hills Concrete Tank” is an infrastructure initiative in the Government sector, located in Cedar City, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a 4 MG AWWA D115 tendon pre-stressed concrete tank; Construction of a CMU building; Site work and electrical improvements.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Cedar City

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Metal, Commercial, Power Generation (CCGT), Residential, Manufacturing (Industrial), Cement

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project