logo

CID 03 Water Well Electrical Rehabilitation

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Project
Closed

This project includes the installation of the following water quality and drainage system improvements within project areas as described below: The project includes the rehabilitation of the electrical panels of the District s three water well located in City Park in Christoval, Texas. Rehabilitation is to include the removal of old panels, wiring, and switches, and replacing with new equipment. T

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Commercial, Government
Location
Christoval, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about CID 03 Water Well Electrical Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CID 03 Water Well Electrical Rehabilitation” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Christoval, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project includes the installation of the following water quality and drainage system improvements within project areas as described below: The project includes the rehabilitation of the electrical panels of the District s three water well located in City Park in Christoval, Texas. Rehabilitation is to include the removal of old panels, wiring, and switches, and replacing with new equipment. The new equipment is to be elevated above the 100-year flood plain with a platform, stairs, and ra...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Christoval

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Car parking, Automotive, Commercial, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project