CIDCO Raw Water Tunnel and Water Treatment Plant Project
Sector: Hydro • Location: Panvel, Maharashtra, India
Source: Dailyhunt
The project involves the design and construction of a 22.21 km raw water tunnel using tunnel boring machine technology to transport water from Kondhane Dam in Karjat to a proposed water treatment plant at Mohope in Panvel. It also includes the design, build, supply, erection, testing, and commissioning of a 250 MLD water treatment facility, along with 15 years of comprehensive operations and maint
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the design and construction of a 22.21 km raw water tunnel using tunnel boring machine technology to transport water from Kondhane Dam in Karjat to a proposed water treatment plant at Mohope in Panvel. It also includes the design, build, supply, erection, testing, and commissioning of a 250 MLD water treatment facility, along with 15 years of comprehensive operations and maintenance under a design, build and operate (DBO) model. The project aims to strengthen long-term water infrastructure for Navi Mumbai and adjoining regions to support rising urban and industrial water demand. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
