Cilacap Power Plant Expansion Phase II

Sector: Power Transmission • Location: Indonesia

Source: World Bank Group

Project
Active

The project entails the second expansion of Cilacap Power Plant (Expansion Phase I has a capacity of 660 MW). The facility is located in Central Java province, Cilacap Regency, Kesugihan sub district. The capacity of the additional facility will be 1x1000 MW.

S2P is a joint venture between the local investor PT Sumber Energi Sakti Prima (51%) and local generator PT Pembangkitan Jawa Bali (PJB). P

Project Information FAQ

Project Information

4 Q
The project “Cilacap Power Plant Expansion Phase II” is an infrastructure initiative in the Power Transmission sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project entails the second expansion of Cilacap Power Plant (Expansion Phase I has a capacity of 660 MW). The facility is located in Central Java province, Cilacap Regency, Kesugihan sub district. The capacity of the additional facility will be 1x1000 MW. S2P is a joint venture between the local investor PT Sumber Energi Sakti Prima (51%) and local generator PT Pembangkitan Jawa Bali (PJB). PT PJB is in turn a wholly-owned subsidiary of the state power utility PT Perusahaan Listrik Negara (PLN). The output will be sold to state power utility PT Perusahaan Listrik Negara (PLN) under a long-term power purchase agreement (PPA). The project requires an investment of approximately $1.4 billion. Bank of China has committed $1 billion to the expansion project. Bank Rakyat Indonesia (Persero) (government - owned) also contributed $300 million, together with China Development Bank - $98 million. No details on equity contributions are available at the moment of collecting the information. On October 12th the construction of the facility commenced. The project construction is projected to be completed in 39 months or the first quarter of 2020. Second sponsor with 49% stake is State owned PLN

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data