Cilacap Power Plant Expansion Phase II
Sector: Power Transmission • Location: Indonesia
Source: World Bank Group
The project entails the second expansion of Cilacap Power Plant (Expansion Phase I has a capacity of 660 MW). The facility is located in Central Java province, Cilacap Regency, Kesugihan sub district. The capacity of the additional facility will be 1x1000 MW.
S2P is a joint venture between the local investor PT Sumber Energi Sakti Prima (51%) and local generator PT Pembangkitan Jawa Bali (PJB). P
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project entails the second expansion of Cilacap Power Plant (Expansion Phase I has a capacity of 660 MW). The facility is located in Central Java province, Cilacap Regency, Kesugihan sub district. The capacity of the additional facility will be 1x1000 MW. S2P is a joint venture between the local investor PT Sumber Energi Sakti Prima (51%) and local generator PT Pembangkitan Jawa Bali (PJB). PT PJB is in turn a wholly-owned subsidiary of the state power utility PT Perusahaan Listrik Negara (PLN). The output will be sold to state power utility PT Perusahaan Listrik Negara (PLN) under a long-term power purchase agreement (PPA). The project requires an investment of approximately $1.4 billion. Bank of China has committed $1 billion to the expansion project. Bank Rakyat Indonesia (Persero) (government - owned) also contributed $300 million, together with China Development Bank - $98 million. No details on equity contributions are available at the moment of collecting the information. On October 12th the construction of the facility commenced. The project construction is projected to be completed in 39 months or the first quarter of 2020. Second sponsor with 49% stake is State owned PLN |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |