logo

Cilacap Power Plant Phase II

Sector: Power Generation (CCGT) • Location: Indonesia

Source: World Bank Group

Project
Active

In 2013, Sumber Segara Primadaya (S2P) began development of a 660 MW coal-fired power plant, an expansion of its existing 600 MW coal fired Cilacap power plant in Karang Kandri village in central Java province in Indonesia. The power plant construction was expected to be completed within 36 months and scheduled to commence operation in 2016. The projected average output of 4.3 TWh/year would be so

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Government, Commercial
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cilacap Power Plant Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cilacap Power Plant Phase II” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 2013, Sumber Segara Primadaya (S2P) began development of a 660 MW coal-fired power plant, an expansion of its existing 600 MW coal fired Cilacap power plant in Karang Kandri village in central Java province in Indonesia. The power plant construction was expected to be completed within 36 months and scheduled to commence operation in 2016. The projected average output of 4.3 TWh/year would be sold to state power utility PT Perusahaan Listrik Negara (PLN) under a long-term power purchase agreement (PPA). S2P is a joint venture between the local investor PT Sumber Energi Sakti Prima (51%) and local generator PT Pembangkitan Jawa Bali (PJB). PT PJB is in turn a wholly-owned subsidiary of the state power utility PT Perusahaan Listrik Negara (PLN). The total cost of the 660 MW expansion was USD 900 million and was financed though loans and internal cash. The project reached financial close in April 2013 after finalizing a USD 700 million concessional debt from China Development Bank (CDB) with no collateral and guarantee. The plant is built and equipped by Chinese companies.

Original sector

Energy

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Government, Commercial

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project