Cilacap Power Plant Phase II

Sector: Power Generation (CCGT) • Location: Indonesia

Source: World Bank Group

Project
Active

In 2013, Sumber Segara Primadaya (S2P) began development of a 660 MW coal-fired power plant, an expansion of its existing 600 MW coal fired Cilacap power plant in Karang Kandri village in central Java province in Indonesia. The power plant construction was expected to be completed within 36 months and scheduled to commence operation in 2016. The projected average output of 4.3 TWh/year would be so

Project Information FAQ

Project Information

5 Q
The project “Cilacap Power Plant Phase II” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2013, Sumber Segara Primadaya (S2P) began development of a 660 MW coal-fired power plant, an expansion of its existing 600 MW coal fired Cilacap power plant in Karang Kandri village in central Java province in Indonesia. The power plant construction was expected to be completed within 36 months and scheduled to commence operation in 2016. The projected average output of 4.3 TWh/year would be sold to state power utility PT Perusahaan Listrik Negara (PLN) under a long-term power purchase agreement (PPA). S2P is a joint venture between the local investor PT Sumber Energi Sakti Prima (51%) and local generator PT Pembangkitan Jawa Bali (PJB). PT PJB is in turn a wholly-owned subsidiary of the state power utility PT Perusahaan Listrik Negara (PLN). The total cost of the 660 MW expansion was USD 900 million and was financed though loans and internal cash. The project reached financial close in April 2013 after finalizing a USD 700 million concessional debt from China Development Bank (CDB) with no collateral and guarantee. The plant is built and equipped by Chinese companies.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data