Cimarron Boulevard Reconstruction
Sector: Car parking • Location: Corpus Christi, Texas, United States of America
Source: Dodge USA
Reconstruction of existing roadway with new pavement, curb and gutters, sidewalk with ADA compliant curb ramps, signage, pavement markings, upgrade street illumination, utility improvements and drainage improvements as needed.
- Status
- Prospective
- Sector
- Car parking, Road, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Automotive, Commercial, Power Generation (CCGT), Cable car, Telecommunications
- Location
- Corpus Christi, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cimarron Boulevard Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Reconstruction of existing roadway with new pavement, curb and gutters, sidewalk with ADA compliant curb ramps, signage, pavement markings, upgrade street illumination, utility improvements and drainage improvements as needed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Corpus Christi |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Automotive, Commercial, Power Generation (CCGT), Cable car, Telecommunications |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
