Cimarron Gold Project
One of 10,000+ projects Taiyo tracks in Nevada.
Source: Mining.com.au
The Cimarron Gold Project is a gold exploration project located in the Walker Lane trend in Nevada. It hosts a resource of 50,000 ounces of contained gold, with plans to potentially expand the estimate through future exploration campaigns. Surface Metals acquired a 90% stake in the project in April 2025 and is currently reviewing targets ahead of upcoming drilling.
- Status
- Prospective
- Sector
- Road
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Mining.com.au
ConstructChat
Ask ConstructChat about Cimarron Gold Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Cimarron Gold Project is a gold exploration project located in the Walker Lane trend in Nevada. It hosts a resource of 50,000 ounces of contained gold, with plans to potentially expand the estimate through future exploration campaigns. Surface Metals acquired a 90% stake in the project in April 2025 and is currently reviewing targets ahead of upcoming drilling. |
Original sector | Mining |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Mining.com.au |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in USA
- Daniel Webster Western Beltway Resurfacing Improvements
- Central West Central Florida DMS CCTV Camera Installation
- Floridas TurnpikeSR 91 and Claude Pepper Memorial HighwayUS 27 Interchange Improvements Project
- Turnpike Resurfacing and Improvements MP 190 to MP 198
- Turnpike Roadside and Safety Improvements CR 470 to I75
- Turnpike Resurfacing Improvements MP 260 to MP 265
- Hanging Research Park Banners
- East Central Street Bridge Funding
