logo

Cimarron Wind Farm (320MW)

Sector: Wind • Location: Mexico

Source: World Bank Group

Project
Active

"The Cimarron Wind Farm project is being developed in the Tecate municipality of Baja California, Mexico. This wind farm forms part of the Energia Sierra Juarez (ESJ) wind complex and is directly linked to the California grid operator, CAISO. With a planned generation capacity of 320 MW, the project is sponsored by Spanish infrastructure developer and operator Elecnor SA, while Sempra Infrastructu

Project Information FAQ

Project Information

4 Q
The project “Cimarron Wind Farm (320MW)” is an infrastructure initiative in the Wind sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"The Cimarron Wind Farm project is being developed in the Tecate municipality of Baja California, Mexico. This wind farm forms part of the Energia Sierra Juarez (ESJ) wind complex and is directly linked to the California grid operator, CAISO. With a planned generation capacity of 320 MW, the project is sponsored by Spanish infrastructure developer and operator Elecnor SA, while Sempra Infrastructure will oversee construction. The Cimarron Wind Farm will feature 64 Vestas wind turbines and utilize Sempra Infrastructure's cross-border high-voltage transmission line, which connects the ESJ complex to CAISO. On the U.S. side, Silicon Valley Power, a municipal electric utility, will purchase the wind farm's output under a 20-year power purchase agreement (PPA). The project carries a total cost of $500 million, and construction began on July 9, 2024." https://renewablesnow.com/news/elecnor-starts-building-320-mw-cimarron-wind-farm-in-mexico-862861/ ; https://newenergyevents.com/elecnor-begins-construction-of-320-mw-cimarron-wind-farm-in-mexico/ ; https://www.grupoelecnor.com/news/elecnor-begins-the-construction-of-a-320-mw-wind-farm-in-mexico ; https://www.evwind.es/2024/07/13/elecnor-begins-construction-of-a-320-mw-wind-power-plant-in-mexico/99677

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data