Cinco Regional Manhole Rehabilitation Phases 5-7 REBID
Sector: Water Supply and Storage • Location: Katy, Texas, United States of America
Source: Dodge USA
Contractor to furnish all materials, labor, and equipment for the rehabilitation of approximately 187 VF of existing sanitary sewer manholes, including, but not limited to, cleaning and chemical grout injection to stop active leaks. Installation of 1-inch thick cementitious lining to manholes. Adding Raven 405, 120 mils or approved equal coating, by-pass pumping as needed, traffic control as neede
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Residential, Government, Chemical (Industrial), Commercial, Manufacturing (Industrial)
- Location
- Katy, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cinco Regional Manhole Rehabilitation Phases 5-7 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor to furnish all materials, labor, and equipment for the rehabilitation of approximately 187 VF of existing sanitary sewer manholes, including, but not limited to, cleaning and chemical grout injection to stop active leaks. Installation of 1-inch thick cementitious lining to manholes. Adding Raven 405, 120 mils or approved equal coating, by-pass pumping as needed, traffic control as needed, and all items as shown within the plans. One existing manhole with T-Lock repairs as needed. W... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Katy |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Residential, Government, Chemical (Industrial), Commercial, Manufacturing (Industrial) |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
