Cipp Sewer Main Lining - Helen St
Closed · Ontario · Last reported Dec 2021
Source: Dodge USA
To Clean, remove lips of slip-joints, (flailing), calcite and minor imperfections if required, inspect and install a cured in place liner in approximately 126 meters of 250 mm clay main from manhole A113(Shanly/Helen St.) to manhole A111(Helen/Walker St.) utilizing trenchless technology.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Tunnel, Commercial, Power Generation (CCGT)
- Location
- Spencerville, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cipp Sewer Main Lining - Helen St
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To Clean, remove lips of slip-joints, (flailing), calcite and minor imperfections if required, inspect and install a cured in place liner in approximately 126 meters of 250 mm clay main from manhole A113(Shanly/Helen St.) to manhole A111(Helen/Walker St.) utilizing trenchless technology. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Spencerville |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Tunnel, Commercial, Power Generation (CCGT) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
