Ciprel IV
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The project consists in: (i) the expansion of the existing CIPREL natural gas-fired power plant in Côte d’Ivoire by adding 111MW steam cycle capacity to 2 x 111MW open cycle gas turbines, converting them into a combined cycle operation, and (ii) the retrofitting of two gas turbines to Dry Low NOx technology for NOx emissions reduction (together the “Project”). The Project, expected to enhance the
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Generation (CCGT), Geothermal, Natural Gas, Government, Fertilizers, Manufacturing (Industrial)
- Location
- Cote d'Ivoire
- Updated
- 19 Nov 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Ciprel IV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project consists in: (i) the expansion of the existing CIPREL natural gas-fired power plant in Côte d’Ivoire by adding 111MW steam cycle capacity to 2 x 111MW open cycle gas turbines, converting them into a combined cycle operation, and (ii) the retrofitting of two gas turbines to Dry Low NOx technology for NOx emissions reduction (together the “Project”). The Project, expected to enhance the efficiency of the power plant by generating 25.5% more power without the use of any additional gas, will be developed, designed, constructed and operated under a 24-year Build-Own-Operate-Transfer (“BOOT”) arrangement. The Project will sell its power to the Government of Côte d’Ivoire (GoCI) through Compagnie Ivoirienne d’Electricité (“CIE”), the private transmission and distribution company. |
Original sector | V-AB - Gas - Thermal Power Generation |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Geothermal, Natural Gas, Government, Fertilizers, Manufacturing (Industrial) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
