Site of the Idylwyld Drive and Circle Drive South interchange. 10km of expressway was constructed from Clarence Avenue to Clancy Drive. A south bridge was constructed over the Saskatchewan River. The Circle Drive South project in Saskatoon, Canada, has been the largest single public construction project in the city to date. Construction work on the $300m project began in May 2010. The ground-break

Project Information FAQ

Project Information

5 Q
The project “Circle Drive South Project” is an infrastructure initiative in the Automotive sector, located in Thailand. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Site of the Idylwyld Drive and Circle Drive South interchange. 10km of expressway was constructed from Clarence Avenue to Clancy Drive. A south bridge was constructed over the Saskatchewan River. The Circle Drive South project in Saskatoon, Canada, has been the largest single public construction project in the city to date. Construction work on the $300m project began in May 2010. The ground-breaking ceremony was held on 28 May 2010 in Diefenbaker Park. In the south-west corner of the park, a small walkway was constructed so the public could follow the progress of the six-lane bridge and eight kilometres of connecting freeway. Both commercial and non-commercial vehicles are benefited from the project. The road project connects the city with national and international trade routes, and, by reducing travel time, it is forecast that the new road will reduce traffic congestion and harmful gas emissions. The original completion date for the project was October 2012. The project, however, was delayed due to construction delays owing to bad weather. The project was opened to public in July 2013. The project is part of the Circle Drive freeway system, which, in turn, is a part of the Provincial and National Highway Systems. The project, together with a new bridge that was built on the South Saskatchewan River, completes the freeway system. The project comprises a six-lane bridge construction and pedestrian and cyclist paths. Five interchanges were built at Idylwyld Drive, Lorne Avenue, Valley Road and 11th Street West, and Preston Avenue South. A 10km expressway section was constructed from Clarence Avenue to Clancy Drive. The project also consists of three rail-grade separation crossings and noise-reduction walls. In June 2010, 11th Street between Avenue W and Circle Drive was closed for two years to allow construction of the Circle Drive / 11th Street interchange. Until then, traffic was diverted along Fletcher Road and Dundonald Avenue. The expressway is divided into four to six lanes. A pedestrian and cyclist facility has also been created to cross the South Saskatchewan River for access to the MVA Trails. The design and build contract was awarded to Graham Flatiron joint venture in March 2010. The preliminary design and project alignment of the bridge were carried out by Stantec Consulting. The design and build subcontract was given to AECOM in 2010. The company, acting as lead designer, was responsible for supplying design services to the new south bridge. The company also renders its services to railway, environmental site-remediation, and storm-water and noise-reduction wall facilities. The cost of the road project was $300m. It was funded by various government agencies: the Federal Government contributed $96m, the Provincial Government $98.5m, the City of Saskatoon $100m and the Rural Municipality of Corman Park funded $200,000. After the bidding process, the Federal Government’s contribution was slashed by $10m, as the winner’s bid was well below the initial projected investment. The contractors received around $48m for land acquisition, geotechnical and on-site planning. The new six-lane bridge over the South Saskatchewan River is an important part of the project. It functions as a bypass, helping improve traffic flow in Saskatoon’s downtown core. It also reduces traffic congestion on the Sid Buckwold Bridge. Based on current traffic modelling, the bridge is expected to serve 30,000 vehicles a day once the city population reaches 250,000 (population growth rate 2.8%). The third, high-speed river crossing helps reduce transit time for people and goods to and from the city. The Federal and provincial governments allocated $86.5m for the construction of the bridge.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data