Circle K - Dinuba, CA
Sector: Water Supply and Storage • Location: Dinuba, California, United States of America
Source: Dodge
Ground up construction 5,200SF building, .78 acre site - Grading, earthwork, underground wet utilities, silt fence storm water erosion controls, electrical, rough carpentry wood framing, drywall, paint, frp, plumbing, mechanical HVAC, doors & hardware, flashings, landscaping, fire sprinklers, fire alarm, concrete, acoustical T-bar ceiling, storefront, restroom accessories, membrane roofing, ti
- Status
- Closed
- Sector
- Water Supply and Storage, Automotive, Manufacturing (Industrial), Power Generation (CCGT), Cement, Power Transmission, Commercial, Residential
- Location
- Dinuba, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Circle K - Dinuba, CA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ground up construction 5,200SF building, .78 acre site - Grading, earthwork, underground wet utilities, silt fence storm water erosion controls, electrical, rough carpentry wood framing, drywall, paint, frp, plumbing, mechanical HVAC, doors & hardware, flashings, landscaping, fire sprinklers, fire alarm, concrete, acoustical T-bar ceiling, storefront, restroom accessories, membrane roofing, tile, sealed concrete, stone veneer masonry, stucco, awnings, gates, masonry trash enclosure |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Dinuba |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Automotive, Manufacturing (Industrial), Power Generation (CCGT), Cement, Power Transmission, Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
