Circle K Store
Start · Arizona · Last reported Jan 2025
Source: Dodge USA
Tenant Improvement For Type V-B Construction, 2,882 Sf, M Occupancy Facility. Revisions Including Interior Merchandising Floor Plan Renovations, New Walk-In Cooler And Co2 Tank. No Sf Increase Or Structural Modifications. Facility Not Equipped With Fire Sprinklers Or Fire Alarms. Approved As Noted: Provide Refrigerant Leak Detection And Alarm For Walk-In Coolers/Freezers In Accordance With 2018 Im
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Commercial, Education, Residential
- Location
- Mesa, Arizona, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Circle K Store
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Tenant Improvement For Type V-B Construction, 2,882 Sf, M Occupancy Facility. Revisions Including Interior Merchandising Floor Plan Renovations, New Walk-In Cooler And Co2 Tank. No Sf Increase Or Structural Modifications. Facility Not Equipped With Fire Sprinklers Or Fire Alarms. Approved As Noted: Provide Refrigerant Leak Detection And Alarm For Walk-In Coolers/Freezers In Accordance With 2018 Imc 1104.2.2 And 2018 Ifc 605.8. Total Square Feet: 2882 |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Mesa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Education, Residential |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
