Circle Water System Improvements Phase 4
Sector: Water Supply and Storage • Location: Circle, Montana, United States of America
Source: Dodge USA
The project consists of 4 Schedules. The first schedule includes the replacement of approximately 1,890 feet of 4" AC pipe with 8" PVC pipe. Schedule 2 includes the replacement of approximately 3,550 feet of 6" AC and CIP pipe with 8" PVC pipe. Schedule 3 includes the replacement of approximately 720 feet of 4" CIP pipe with 8" PVC pipe. Schedule 4 includes the replacement of approximately 3,370 f
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Circle, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Circle Water System Improvements Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of 4 Schedules. The first schedule includes the replacement of approximately 1,890 feet of 4" AC pipe with 8" PVC pipe. Schedule 2 includes the replacement of approximately 3,550 feet of 6" AC and CIP pipe with 8" PVC pipe. Schedule 3 includes the replacement of approximately 720 feet of 4" CIP pipe with 8" PVC pipe. Schedule 4 includes the replacement of approximately 3,370 feet of 4" and 6" AC pipe with 8" PVC pipe. All pipe replacement will also include the replacement... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Circle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
