Circleville Solar Facility
Planning schematics · Ohio · Last reported Apr 2024
Source: Dodge USA
Develop, construct, and operate an up to 70 megawatt solar facility to be located on 575 acres north of U.S. Route 22, south of State Route 56, west of the City of Circleville, and east of Smith Hulse Road in Wayne and Jackson townships, Pickaway County.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Road, Commercial
- Location
- Circleville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Circleville Solar Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Develop, construct, and operate an up to 70 megawatt solar facility to be located on 575 acres north of U.S. Route 22, south of State Route 56, west of the City of Circleville, and east of Smith Hulse Road in Wayne and Jackson townships, Pickaway County. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Circleville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Road, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
