logo

Circuito Exterior Mexiquense

Sector: Commercial • Location: Ciudad de México, Mexico

Source: World Bank Group

Project
Active

In 2003, the Government of the Estado de Mexico awarded a 30 year contract to build, operate and transfer a toll road that links four radial highways and circumvents Mexico City to Concesionaria Mexiquense SA de CV (Conmex). The Circuito Exterior Mexiquense was a 152.7 km long four-lane toll road that bypasses Mexico City in the North and East, connecting four highways from Mexico City to Queretar

Status
Prospective
Sector
Commercial, Government, Road
Location
Ciudad de México, Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Circuito Exterior Mexiquense

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Circuito Exterior Mexiquense” is an infrastructure initiative in the Commercial sector, located in Ciudad de México, Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In 2003, the Government of the Estado de Mexico awarded a 30 year contract to build, operate and transfer a toll road that links four radial highways and circumvents Mexico City to Concesionaria Mexiquense SA de CV (Conmex). The Circuito Exterior Mexiquense was a 152.7 km long four-lane toll road that bypasses Mexico City in the North and East, connecting four highways from Mexico City to Queretaro, Pachuca and Puebla. The project was set to be developed in four phases: The first was a 52.7 km road between Jorobas and Penon; the second was a 37 km road between Texcoco and Chalco; the third was 19 km and connected Tultepec with Lago de Guadalupe; the fourth phase was 44 km long linking Chalco and Nepantla. Conmex was formed by Obrascon Huarte Lain (Grupo OHL – 74.55%) and Compania Espanola de Financiacion del Desarrollo (Cofides – 25.45%). The total cost for the four phases of the project was estimated at US$761.5 million (8,581 million pesos). The first phase of the project had an estimated cost of US$352 million (3,970 million pesos) and reached financial closure in October 2004. BBVA-Bancomer, Banco Nacional de Obras y Servicios Publicos (Banobras –Mexico’s National Bank of Public Works and Services) and Instituto de Credito Oficial (ICO –Spain’s export credit agency) provided in equal parts a US$205 million (2,310 million pesos) credit facility in local currency to for the first phase of the project. The remaining US$147 million was being financed by Conmex’s shareholders. Construction for the first phase began in 2004 and in November 2005 it began operating. According to the contract, construction of the remaining phases was to be triggered by meeting pre-specified traffic levels in the operating toll road. In June 2009, OHL cloased a 12 billion pesos loan to refinance existing debt and finance phases II and III of the road. BBVA contributed Ps2.5 billion, Banorte Ps2 billion, ICO Ps1.876 billion, Santander Ps1.625 billion, and Banobras Ps4 billion. The 15-year debt was oversubscribed. 5.5 billion was OHL's equity contribution. The total investment cost of phase II and phase III was approximately US $400 million. Construction work on the second phase began officially on April 29 2006, beggining with a 6 km stretch between Penon-Texcoco-Bordo de Xochiaca. Source: http://transparencia.edomex.gob.mx/saascaem/informacion/avanceobra/circuitoexteriormexiquense.pdf Estimated costs of the project: Phase 1: 3,970 million pesos Phase 2: 2,000 million pesos Phase 3: 1,496 million pesos Phase 4: 1,115 million pesos Source: http://transparencia.edomex.gob.mx/saascaem/informacion/avanceobra/circuitoexteriormexiquense.pdf

Original sector

Transport

Budget

Location

Country

Mexico

State

Ciudad de México

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Road

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project