Cirebon 2 Coal - Fired Power Plant
Sector: Commercial • Location: Indonesia
Source: World Bank Group
The coal fired power plant Cirebon Unit 2, with a capacity of 1,000 megawatt, is a power plant project in the West Java region of Cirebon, Indonesia.
The Cirebon project is developed by Cirebon Energi Prasarana (CEPR), a consortium consisting of Marubeni (35%), Indika Energy (25%), Samtan (20%), Korea Midland Power (10%) and Chubu Electric (10%). This consortium signed a 25-year power purchase a
- Status
- Failure
- Sector
- Commercial, Power Generation (CCGT), Power Transmission, Government
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cirebon 2 Coal - Fired Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | distressed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The coal fired power plant Cirebon Unit 2, with a capacity of 1,000 megawatt, is a power plant project in the West Java region of Cirebon, Indonesia. The Cirebon project is developed by Cirebon Energi Prasarana (CEPR), a consortium consisting of Marubeni (35%), Indika Energy (25%), Samtan (20%), Korea Midland Power (10%) and Chubu Electric (10%). This consortium signed a 25-year power purchase agreement with the Indonesian state power utility PLN in October 2015. The Marubeni-led consortium has awarded Black & Veatch, a US-based global engineering company, the engineering contract. Total investment is estimated at $2175 million and is being financed by 80:20 debt to equity. Debt funding ($1740 million) is being provided by Japan Bank for International Cooperation ($730.80 mn), Export-Import Bank of Korea ($417.60 mn), and the remaining funding being provided by four commercial banks, namely Sumitomo Mitsui Banking Corporation ($155.68 million), Mizuho Bank ($155.68 million), Bank of Tokyo-Mitsubishi UFJ ($155.68 million) and ING Bank ($124.55 million). Commercial loans are covered by Nippon Export and Investment Insurance (NEXI). Financial closure was reached on 18th April 2017. Construction is expected to start in September 2017 and the plant is expected to commence operation in August 2021. Only one day after the financial closure, an Indonesian court (Bandung Administrative Court ) has ruled that the environmental permit granted for the development of a coal-fired power plant is unlawful. It has ordered the environmental permit for the project to be revoked. The developer (a consortium of sponsors) was given 14 days to appeal the ruling. https://ijglobal.com/data/transaction/34565/cirebon-2-coal-fired-power-plant-1000mw-ipp http://www.modernpowersystems.com/news/newsindonesian-coal-plant-licence-revoked-5799515 https://ijglobal.com/articles/107318/cirebon-2-sponsors-file-for-new-environmental-permit |
Original sector | Energy |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
