Distressed

The coal fired power plant Cirebon Unit 2, with a capacity of 1,000 megawatt, is a power plant project in the West Java region of Cirebon, Indonesia.

The Cirebon project is developed by Cirebon Energi Prasarana (CEPR), a consortium consisting of Marubeni (35%), Indika Energy (25%), Samtan (20%), Korea Midland Power (10%) and Chubu Electric (10%). This consortium signed a 25-year power purchase a

Status
Failure
Sector
Commercial, Power Generation (CCGT), Power Transmission, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cirebon 2 Coal - Fired Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cirebon 2 Coal - Fired Power Plant” is an infrastructure initiative in the Commercial sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

distressed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The coal fired power plant Cirebon Unit 2, with a capacity of 1,000 megawatt, is a power plant project in the West Java region of Cirebon, Indonesia. The Cirebon project is developed by Cirebon Energi Prasarana (CEPR), a consortium consisting of Marubeni (35%), Indika Energy (25%), Samtan (20%), Korea Midland Power (10%) and Chubu Electric (10%). This consortium signed a 25-year power purchase agreement with the Indonesian state power utility PLN in October 2015. The Marubeni-led consortium has awarded Black & Veatch, a US-based global engineering company, the engineering contract. Total investment is estimated at $2175 million and is being financed by 80:20 debt to equity. Debt funding ($1740 million) is being provided by Japan Bank for International Cooperation ($730.80 mn), Export-Import Bank of Korea ($417.60 mn), and the remaining funding being provided by four commercial banks, namely Sumitomo Mitsui Banking Corporation ($155.68 million), Mizuho Bank ($155.68 million), Bank of Tokyo-Mitsubishi UFJ ($155.68 million) and ING Bank ($124.55 million). Commercial loans are covered by Nippon Export and Investment Insurance (NEXI). Financial closure was reached on 18th April 2017. Construction is expected to start in September 2017 and the plant is expected to commence operation in August 2021. Only one day after the financial closure, an Indonesian court (Bandung Administrative Court ) has ruled that the environmental permit granted for the development of a coal-fired power plant is unlawful. It has ordered the environmental permit for the project to be revoked. The developer (a consortium of sponsors) was given 14 days to appeal the ruling. https://ijglobal.com/data/transaction/34565/cirebon-2-coal-fired-power-plant-1000mw-ipp http://www.modernpowersystems.com/news/newsindonesian-coal-plant-licence-revoked-5799515 https://ijglobal.com/articles/107318/cirebon-2-sponsors-file-for-new-environmental-permit

Original sector

Energy

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Power Transmission, Government

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project