Cisumdawu Toll Road
Sector: Road • Location: Indonesia
Source: World Bank Group
The project entails the construction of a 60.27 KM Cisumdawu toll road project which is compromised of six separate segments – Cileunyi-Rancakalong, Rancakalong-Sumedang, Sumedang-Cimalaka, Cimalaka-Legok, Legok-Ujunngjaya and Ujunjaya-Dawuan. Designed number of lanes is 2x2 with 3.6 m width. SPV is PT Citra Karya Jabar Tol a JV between the sponsors PT Citra Marga Nusaphala Persada Tbk (51%), PT W
- Status
- Prospective
- Sector
- Road, Government, Commercial
- Location
- Indonesia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cisumdawu Toll Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of a 60.27 KM Cisumdawu toll road project which is compromised of six separate segments – Cileunyi-Rancakalong, Rancakalong-Sumedang, Sumedang-Cimalaka, Cimalaka-Legok, Legok-Ujunngjaya and Ujunjaya-Dawuan. Designed number of lanes is 2x2 with 3.6 m width. SPV is PT Citra Karya Jabar Tol a JV between the sponsors PT Citra Marga Nusaphala Persada Tbk (51%), PT Waskita Toll Road (15%), PT Pembanguan Perumahan (Persero) (14%), PT Brantas Abipraya (Persero) (10%) and PT Jasa Sarana (10%). Around 90% of the toll road project will be funded by a soft loan from the Export-Import Bank of China, with the remaining 10% through the state budget. Total cost of the project is IDR 13.626 trillion or $ $ 1.362 billion. The period of the BOT concession is 35 years. Financial close took place on December 2, 2012. https://www.roadtraffic-technology.com/uncategorised/newsindonesia-commences-construction-cisumdawu-toll-road-project/ http://contenidos.ceoe.es/resources/image/presentacion_indonesia_4_2014_05_21.pdf http://id.citramarga.com/tentang-kami/profil-investasi-cmnp/entitas-anak-langsung/pt-citra-karya-jabar-tol/ |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Indonesia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
