Cité Griset Apartment / Mesnil Architectures
Sector: Steel • Location: France
Source: ArchDaily
Text description provided by the architects.In the heart of Cité Griset, a former 19th-century foundry, lies an apartment made up of numerous rooms and whose layout may be considered somewhat cluttered and eclectic manner.The newly opened space benefits the kitchen, which extends into the pantry, now accessible through the former elevator opening. A work surface appears to float, suspended from th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Text description provided by the architects.In the heart of Cité Griset, a former 19th-century foundry, lies an apartment made up of numerous rooms and whose layout may be considered somewhat cluttered and eclectic manner.The newly opened space benefits the kitchen, which extends into the pantry, now accessible through the former elevator opening. A work surface appears to float, suspended from the columns, emphasizing the horizontal lines of the design and cleverly concealing the fridge, the only vertical element. The dining area and double living room now fully take advantage of the large windows that overlook the courtyard and its brick columns. In the sleeping area, the corridor connecting the suite to the dining room is marked by a generous glass partition, allowing natural light to flood the space.The renovation aims to simplify the existing layout by consolidating the support functions into a technical zone on the second level, thereby freeing up the living spaces and opening up cross views. The first step involves removing the walls of the old freight elevator, which are replaced by a double steel column frame left exposed, echoing the metalwork of the former factory.Opposite, in response to the geometry of the room, a full-length mirrored dressing room has been installed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
