Citra Energies Solar Project
Sector: Power Generation (CCGT) • Location: Kedah, Malaysia
Source: Machine Maker
A solar power project to supply certified solar power to Google's data center operations in Malaysia. The project involves an installed capacity of around 20 megawatts and aims to deliver 1 terawatt-hour of renewable electricity over 21 years.
- Status
- Closed
- Sector
- Power Generation (CCGT), Data Center, Solar
- Location
- Kedah, Malaysia
- Updated
- 22 Jul 2026
- Source
- Machine Maker
ConstructChat
Ask ConstructChat about Citra Energies Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A solar power project to supply certified solar power to Google's data center operations in Malaysia. The project involves an installed capacity of around 20 megawatts and aims to deliver 1 terawatt-hour of renewable electricity over 21 years. |
Original sector | Energy |
Location
Country | Malaysia |
State | Kedah |
Source
Source | Machine Maker |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center, Solar |
Article published date | 2025-12-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
