City and County of Denver New Lift Station #10 IQC
Construction documents · Colorado · Last reported Sep 2024
Source: Dodge USA
This project includes a full lift station design including a new building structure, modern mechanical, electrical, and instrumentation equipment to improve reliability, reduce operation and maintenance costs, and bring the facility up-to-date with current standards. City and County of Denver Public Works Department, may be seeking a consultant to provide design services for new building structure
- Status
- Closed
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Commercial, Water Supply and Storage, Government
- Location
- Denver, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about City and County of Denver New Lift Station #10 IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes a full lift station design including a new building structure, modern mechanical, electrical, and instrumentation equipment to improve reliability, reduce operation and maintenance costs, and bring the facility up-to-date with current standards. City and County of Denver Public Works Department, may be seeking a consultant to provide design services for new building structure, modern mechanical, electrical, and instrumentation equipment to improve reliability, reduce ope... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Denver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Commercial, Water Supply and Storage, Government |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
