City Hall 3rd Floor Renovation
Closed · Texas · Last reported Sep 2025
Source: Dodge
9,286 sq ft - Renovation will take part in 2 phases - Existing Restrooms & Drinking Fountain to remain. 9286sf. Work of the contract shall include 4 separate phases. 1. Interior demolition in the south side of the 3rd floor in an area more fully described on the drawings. 2. Interior remodeling in the south side of the 3rd floor in an area more fully described on the drawings including fire sprink
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Manufacturing (Industrial), Government
- Location
- Galveston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about City Hall 3rd Floor Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 9,286 sq ft - Renovation will take part in 2 phases - Existing Restrooms & Drinking Fountain to remain. 9286sf. Work of the contract shall include 4 separate phases. 1. Interior demolition in the south side of the 3rd floor in an area more fully described on the drawings. 2. Interior remodeling in the south side of the 3rd floor in an area more fully described on the drawings including fire sprinkler work, partition construction, interior finishes, mechanical work, electrical work, and plumbi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Galveston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Manufacturing (Industrial), Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
