City Hall Building Improvements REBID
Sector: Solar • Location: Bainbridge Island, Washington, United States of America
Source: Dodge USA
Enclosure of the map room conference area, installation of secure door for the front desk, bike rack installation, electrical outlets, security system and bid additive alternatives to secure the outdoor patio and solar film on skylights.
- Status
- Under Construction
- Sector
- Solar, Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Bainbridge Island, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about City Hall Building Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enclosure of the map room conference area, installation of secure door for the front desk, bike rack installation, electrical outlets, security system and bid additive alternatives to secure the outdoor patio and solar film on skylights. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bainbridge Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- William and Linda Frost Center for Research and Innovation
- INSTALL (27) 360W MODULES AT 9.72 KW TOTAL.
- ROOF MOUNT PV SYSTEM: (16) 335W MODULES AT 5.36 KW TOTAL
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 20 UNIT 240 (7) MODULE 2.45 KW SYSTEM
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.19 KW 9 PANELS
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 5.1 KW 12 MODULES
- 9.8 KW PV (37) MODULE SOLAR ROOFTOP INSTALLATION GARAGE INSTEAD OF THE EXTERIOR
- PV SOLAR ROOF MOUNT INSTALLATION: (11) 400W MODULES AT 4.4 K W TOTAL.
