City Maintenance Facility Project
Sector: Car parking • Location: Shoreline, Washington, United States of America (USA)
Since 1996, the City’s maintenance crews have shared space at Hamlin Park. This facility is called Hamlin Yard. Its main users are Parks and Public Works crews. Maintenance needs have grown over time, and Hamlin Yard can no longer serve these needs safely and efficiently. In 2015 we began to study building a new Public Works maintenance facility. The location first chosen for building was the Nort
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | phase: ballinger construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Since 1996, the City’s maintenance crews have shared space at Hamlin Park. This facility is called Hamlin Yard. Its main users are Parks and Public Works crews. Maintenance needs have grown over time, and Hamlin Yard can no longer serve these needs safely and efficiently. In 2015 we began to study building a new Public Works maintenance facility. The location first chosen for building was the North Maintenance Facility property, which the City purchased in 2013. The study found that building a maintenance base at this property had higher cost and risk than the City was comfortable with. After further Council discussion, we looked at ideas to use other properties for a maintenance base. Overall, we found that: There isn’t a single City-owned site that would enable us to build one large maintenance facility; and It isn’t feasible to purchase new property to construct one, large facility. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Car parking projects in United States of America (USA)
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
- SH 36 from FM 2218 to FM 1495 - Brazoria County
- SH 6 Reconstruction - Gorman
- Memorial Drive from BW 8 to Tallowood Road
