City of Berthoud New Joint Water and Wastewater System
One of 10,000+ projects Taiyo tracks in Colorado.
Source: Dodge
The improvements proposed include 140 feet of 30-inch and 3,630 feet of 24-inch sewer main pipe, and 3,460 feet of 16-inch water transmission main pipe. The pipes are co-located in a portion of the alignment, which begins at State Highway 56 and extends to the south end of Parcel 9413300001.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Road
- Location
- Berthoud, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about City of Berthoud New Joint Water and Wastewater System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvements proposed include 140 feet of 30-inch and 3,630 feet of 24-inch sewer main pipe, and 3,460 feet of 16-inch water transmission main pipe. The pipes are co-located in a portion of the alignment, which begins at State Highway 56 and extends to the south end of Parcel 9413300001. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Berthoud |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
