logo

CITY OF CHAMBLEE RAIL TRAIL EXTENSION - LCI

Sector: Rail • Location: Chamblee, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed shared-use path begins at Pierce Drive and travels north towards Peachtree Boulevard, and then follow Peachtree Industrial Boulevard until it crosses Chamblee Dunwoody Road. The path continues south on Chamblee Dunwoody Road until crossing and following American Drive eastward until it crosses American Industrial Way. The path continues between businesses on an independent alignment u

Project Information FAQ

Project Information

3 Q
The project “CITY OF CHAMBLEE RAIL TRAIL EXTENSION - LCI” is an infrastructure initiative in the Rail sector, located in Chamblee, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed shared-use path begins at Pierce Drive and travels north towards Peachtree Boulevard, and then follow Peachtree Industrial Boulevard until it crosses Chamblee Dunwoody Road. The path continues south on Chamblee Dunwoody Road until crossing and following American Drive eastward until it crosses American Industrial Way. The path continues between businesses on an independent alignment until it reaches Broad Street. The path travels south on Broad Street until it crosses an independent alignment behind commercial businesses. The path connects to the east side of Ingersoll Rand Drive, crossing Irvindale Way, and continues south until reaching Peachtree Road. The path will travel along Peachtree Road to the Chamblee/Doraville city limits, crossing and tying into an existing sidewalk. The path is approximately 1.5 miles in length.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data