logo

City of Chandler Solar Project

Sector: Car parking • Location: Chandler, Arizona, United States

Source: The AI Journal

Project
Under Construction

Ameresco, Inc. has initiated a solar photovoltaic (PV) project for the City of Chandler, deploying solar systems across 22 municipal facilities. The project aims to produce over 14.5 million kWh annually, offsetting more than 60% of the electricity needs of the sites and saving the city over $1 million annually in utility costs. The portfolio includes covered parking canopies, rooftop systems, and

Status
Under Construction
Sector
Car parking, Solar, Government, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Automotive
Location
Chandler, Arizona, United States of America
Updated
22 Jul 2026
Source
The AI Journal

ConstructChat

Ask ConstructChat about City of Chandler Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “City of Chandler Solar Project” is an infrastructure initiative in the Car parking sector, located in Chandler, Arizona, United States. Taiyo aggregates data on it from The AI Journal.

Participants

Sponsoring Agency

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ameresco, Inc. has initiated a solar photovoltaic (PV) project for the City of Chandler, deploying solar systems across 22 municipal facilities. The project aims to produce over 14.5 million kWh annually, offsetting more than 60% of the electricity needs of the sites and saving the city over $1 million annually in utility costs. The portfolio includes covered parking canopies, rooftop systems, and large-scale ground-mount arrays at water treatment facilities.

Original sector

Energy

Location

Country

United States of America (USA)

State

Arizona

City

Chandler

Source

Source

The AI Journal

URL

More Details

Record type

Project

Sector

Car parking, Solar, Government, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Automotive

Article published date

2025-11-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project