City of Eagle River Silver Lake Road Project
Sector: Water Supply and Storage • Location: Eagle River, Wisconsin, United States of America
Source: Dodge
110 L.F. 15-inch to 18-inch Storm Culvert 2,500 C.Y. Unclassified Excavation 300 C.Y. Granular Fill 1,940 C.Y. Crushed Aggregate Base Course 5,800 S.Y. Geogrid 1,150 TON Asphaltic Concrete Pavement 1,300 L.F. Concrete Curb & Gutter 7,680 S.F. Concrete Sidewalk 500 L.F. Sawcut Asphalt Pavement 3,150 L.F. Epoxy Pavement Marking 1 L.S. Traffic Control including Detour 300 S.Y. Erosion Matting 400 L.F
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government, Rail, Waste Processing and Treatment, Cement, Commercial, Car parking, Automotive
- Location
- Eagle River, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about City of Eagle River Silver Lake Road Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 110 L.F. 15-inch to 18-inch Storm Culvert 2,500 C.Y. Unclassified Excavation 300 C.Y. Granular Fill 1,940 C.Y. Crushed Aggregate Base Course 5,800 S.Y. Geogrid 1,150 TON Asphaltic Concrete Pavement 1,300 L.F. Concrete Curb & Gutter 7,680 S.F. Concrete Sidewalk 500 L.F. Sawcut Asphalt Pavement 3,150 L.F. Epoxy Pavement Marking 1 L.S. Traffic Control including Detour 300 S.Y. Erosion Matting 400 L.F. Cedar Split Rail Fence 1 L.S. Turf Restoration |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Eagle River |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Rail, Waste Processing and Treatment, Cement, Commercial, Car parking, Automotive |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
