logo

City of Hamilton Biosolids Management Facility

Sector: Cement • Location: Canada

Source: Bird Construction

Project
Unknown

This project was completed for the Hamilton Water Division within the Public Works Department at the City of Hamilton and included the design, construction, financing, operation, and maintenance (DBFOM) of a new 60,000 wet tonne per year biosolids processing facility at the Woodward Avenue Wastewater Treatment Plant. The objectives of the project for the City of Hamilton are to provide the City wi

Status
Unknown
Sector
Cement, Commercial, Geothermal, Government, Metal, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)
Location
Canada
Updated
22 Jul 2026
Source
Bird Construction

ConstructChat

Ask ConstructChat about City of Hamilton Biosolids Management Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “City of Hamilton Biosolids Management Facility” is an infrastructure initiative in the Cement sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Participants

Sponsoring Agency

Company

Status

Original status

unknown

Taiyo status

Unknown

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project was completed for the Hamilton Water Division within the Public Works Department at the City of Hamilton and included the design, construction, financing, operation, and maintenance (DBFOM) of a new 60,000 wet tonne per year biosolids processing facility at the Woodward Avenue Wastewater Treatment Plant. The objectives of the project for the City of Hamilton are to provide the City with a stable, long-term solution to biosolids management that includes a 30-year operations and maintenance contract with renewal options. The facility utilizes a thermal drying treatment process and equipment supplied by Andritz Drying Technologies and is the first of its kind in Canada. The project consisted of the design and construction of the new facility on the location of a decommissioned incinerator at the Woodward site and included complete demolition and remediation of the existing site before work could start on the new building. The new three-storey structure consists of precast concrete, insulated metal panels, and a modified bitumen roofing system. The City of Hamilton Biosolids Management Facility has an innovative finance structure. It is one of the first municipal wastewater projects of its kind supported by Infrastructure Canada and will act as a model for future municipalities that have projects with capital expenditure in a range previously considered to be too small for P3s. Bird played a key role in developing and maintaining relationships with the partners, operator, and client. The end result will be a complex facility that will maximize social, environmental, and economic benefits for the City of Hamilton.

Procurement method

Location

Country

Canada

Source

Source reliability

High

Source

Bird Construction

URL

More Details

Record type

Project

Sector

Cement, Commercial, Geothermal, Government, Metal, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2023-11-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project