City of Mill Creek 2027-2028 Grade C Pipe Rehabilitation
Pre-design · Washington · Last reported Mar 2024
Source: Dodge USA
This project anticipates the completion of a new stormwater pipe aging and failing work plan completed during 2014 to 2015. The work is expected to follow the same general parameters, with trenchless methods used to rehabilitate stormwater water pipes 18 inches or greater in diameter that are showing signs of excessive wear that may lead to replacement needs (or failures) prior to the end of a pip
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial)
- Location
- Mill Creek, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about City of Mill Creek 2027-2028 Grade C Pipe Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project anticipates the completion of a new stormwater pipe aging and failing work plan completed during 2014 to 2015. The work is expected to follow the same general parameters, with trenchless methods used to rehabilitate stormwater water pipes 18 inches or greater in diameter that are showing signs of excessive wear that may lead to replacement needs (or failures) prior to the end of a pipe's expected operational life. As this plan and its recommended scope is not complete yet, the fu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mill Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
