City of Warman Sewage Treatment Lagoon Expansion and Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The scope of work for the Project includes increasing the depth of the existing primary and secondary lagoon cells by removing sludge from the primary cells and raising the dyke walls, installing an aeration system in the primary and secondary cells, constructing a blower building for the aeration system, constructing an approximately 7,000 meter discharge pipeline to the South Saskatchewan River
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial
- Location
- Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about City of Warman Sewage Treatment Lagoon Expansion and Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work for the Project includes increasing the depth of the existing primary and secondary lagoon cells by removing sludge from the primary cells and raising the dyke walls, installing an aeration system in the primary and secondary cells, constructing a blower building for the aeration system, constructing an approximately 7,000 meter discharge pipeline to the South Saskatchewan River and all associated works. The proposed Project will increase wastewater treatment capacity and improve overall effluent discharge quality in the City of Warman, to comply with provincial and federal regulations. The City is currently discharging effluent into the South Saskatchewan River and the spring discharge is not meeting the provincial acute toxicity regulations. The City of Warman has a rapidly growing population. Based on an approximately 8% population growth, the City anticipates having to accommodate 11,000 cubic meters/day of wastewater within the next 20 years. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Saskatchewan |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
