logo

City of Yorkton - Logan Green Pathway

Sector: Solar • Location: Saskatchewan, Canada

Source: Infrastructure Canada

Project
Completed

This project will retrofit and upgrade an existing granular pathway, which is part of the active transportation network, to asphalt by removing the granular and organic material and re-building the pathway to provide an asphalt surface. Solar lights will be placed every 35 meters to ensure public safety and comfort using the pathway, especially in the winter months, when it is dark before the work

Project Information FAQ

Project Information

4 Q
The project “City of Yorkton - Logan Green Pathway” is an infrastructure initiative in the Solar sector, located in Saskatchewan, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will retrofit and upgrade an existing granular pathway, which is part of the active transportation network, to asphalt by removing the granular and organic material and re-building the pathway to provide an asphalt surface. Solar lights will be placed every 35 meters to ensure public safety and comfort using the pathway, especially in the winter months, when it is dark before the workday ends. The pathway is part of the City’s Active Transportation Network which provides residents an opportunity to choose self-powered transportation to access services in our downtown. This pathway will also provide a connection to community soccer fields, community gardens, a memorial tree park, a cemetery as well as other recreational pathways. Pathways had become an important aspect in the community prior to Covid, but have become even more important during the pandemic as people look for ways to stay active and healthy outdoors. Further, the community is a winter city, experiencing cold weather for 6 months or more each year. An extension of the pathway connectivity has been added to a parking location from the Laurier connection to the Dulmage Drive parking lots and include a paved pathway and solar lights. The early setting sun (as early as 4:30) also makes it difficult to encourage people to be active outside. Providing hard surface pathways allows for simpler snow clearing in the winter months and a well-lit pathway will encourage people to get out and stay active when it is too easy to choose staying in their house. Hard surface pathways support different modes of human powered wheeled active transportation options such as roller blades, wheelchairs, skateboards and strollers and provides low cost or no-cost options for people to choose to be active and stay healthy and stay connected.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data