logo

City Trunk Line South – Unit 3

Sector: Commercial • Location: Los Angeles, California, United States of America

Source: Los Angles Department of Water and Power (LADWP)

Project
Ongoing

The City Trunk Line South – Unit 3 (CTLS-3) Project consists of the installation of approximately 10,250 linear feet of 60-inch diameter welded steel pipeline and appurtenances. The project route is along Whitsett Avenue from Vanowen Street to Magnolia Boulevard in the North Hollywood area of Los Angeles. Two construction methods will be used for construction: Open-Cut: 6,064 ft. Pipe Jacking: 4,1

Project Information FAQ

Project Information

4 Q
The project “City Trunk Line South – Unit 3” is an infrastructure initiative in the Commercial sector, located in Los Angeles, California, United States of America. Taiyo aggregates data on it from Los Angles Department of Water and Power (LADWP).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The City Trunk Line South – Unit 3 (CTLS-3) Project consists of the installation of approximately 10,250 linear feet of 60-inch diameter welded steel pipeline and appurtenances. The project route is along Whitsett Avenue from Vanowen Street to Magnolia Boulevard in the North Hollywood area of Los Angeles. Two construction methods will be used for construction: Open-Cut: 6,064 ft. Pipe Jacking: 4,186 ft. The CTLS-3 Project will be divided into 14 different Work Areas (WA). Dividing the project into multiple work areas will concentrate the impact of the construction to those specific sites. The project will move in a linear fashion, moving from one area to another, over the project duration. Pipe-jacking construction methods were selected to be used and implemented along major key intersections where commercial land uses are located to alleviate traffic impact.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data