CityLink-Tulla Road Widening, Melbourne, Australia

Sector: Airport • Location: World

Source: Road Traffic Technology

Project
Closed

Construction on CityLink to Tullamarine road widening project began in October 2015. Credit: Bidgee. The CityLink-Tulla Road widening includes addition one extra lane per direction between the Bolte Bridge and Melbourne Airport. Credit: Marcus Wong Wongm. The road widening includes the addition of an extra lane on the Bolte Bridge and a section of the West Gate Freeway. Credit: JohnnoShadbolt. The

Project Information FAQ

Project Information

5 Q
The project “CityLink-Tulla Road Widening, Melbourne, Australia” is an infrastructure initiative in the Airport sector, located in World. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction on CityLink to Tullamarine road widening project began in October 2015. Credit: Bidgee. The CityLink-Tulla Road widening includes addition one extra lane per direction between the Bolte Bridge and Melbourne Airport. Credit: Marcus Wong Wongm. The road widening includes the addition of an extra lane on the Bolte Bridge and a section of the West Gate Freeway. Credit: JohnnoShadbolt. The CityLink to Tulla road widening is intended to enhance the daily capacity and reduce travel times across the 24km route between the CityLink tunnels and Melbourne Airport (MEL). The two-stage construction project commenced in October 2015 and is expected to be completed by mid-2018. The project is owned by Australia’s Victorian Government and CityLink. The construction work from Melbourne Airport to Bulla Road is being managed by VicRoads, while that from Bulla Road to Power Street is being managed by Transurban. The CityLink Tullamarine corridor is one of the busiest most congested roads in Melbourne and currently carries approximately 210,000 vehicles. It is estimated to be used by more than 235,000 vehicles a day by 2031. The proposal to widen the Citylink and Tullamarine Freeway was initiated in August 2015. The freeway widening work is proposed to be completed in two stages. The first stage of construction began in October 2015, followed by the second stage in May 2016. The benefits of the freeway road widening will include enhancement of the capacity on CityLink-Tulla road by 30%. It will result in a reduction of commercial vehicles using local roads, as more than 3,000 heavy and commercial vehicles will be able to use the freeway. It will also ease congestion and improve safety and will reduce casualty crashes by 20%. The road widening project is expected to provide direct and indirect employment opportunities for more than 1,400 people. The project includes the addition of one extra lane in each direction between the Bolte Bridge and Melbourne Airport on the Tullamarine Freeway. It includes the construction of an extra lane on the Bolte Bridge and a section of the West Gate Freeway between Bolte Bridge and Power Street. The freeway widening project also includes the construction of a new bridge over CityLink and the Craigieburn train line, and a new Bell Street to Pascoe Vale Road connection. The project also includes the construction of two new dedicated lanes to Bell Street, from the Tullamarine Freeway and Calder Freeway, and one new dedicated lane from the Tullamarine Freeway and Mickleham Road to the Western Ring Road. It also includes upgrading the English St. Interchange. The project further includes establishing a freeway management system, and overhead electronic speed limit signs to communicate speed limits and lane availability. Stop-and-go signals will be set up for on-ramps for safer merging, CCTV cameras will be installed to monitor traffic and incidents, in addition to variable message boards will be fixed to notify road users of planned changes or disruptions. Construction between Bulla Road and Bell Street section began in October 2015, while that on the Melbourne Airport to Bulla Road section began in May 2016. Construction at Strathmore Secondary College is currently underway and is expected to be fully completed by mid-2018. Leighton Contractors was awarded a $570m contract to design and construct the length from Melbourne Airport on the Tullamarine Freeway to Power Street on the Westgate Freeway in April 2015. Lendlease won a $200m contract to provide widening and other improvements to the Tullamarine Freeway between Melbourne Airport and Bulla Road in February 2016. The freeway widening project is estimated to be completed with a $1.28bn investment. Transurban contributed $850m on the section between the tunnels and Bulla Road. The federal government will contribute $200m towards the section between Melbourne Airport and Melrose Drive.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data