logo
ProjectConstruction

Civic Center Central Plant Refurbish

One of 10,000+ projects Taiyo tracks in California.

Source: LA County Department of Public Work (DPW)

The Civic Center Central Heating and Refrigeration Plant supplies chilled water and steam for comfort heating and cooling to 14 buildings in the Civic Center area including the Cathedral of Our Lady of the Angels and to the Walt Disney Concert Hall. The plant also generates electricity, which is no longer economically viable. The original 1950s boilers are past their useful life and cannot be made

Status
Under Construction
Sector
Stadium, Water Supply and Storage, Power Generation (CCGT), Government, Residential, Manufacturing (Industrial)
Location
California, United States of America
Updated
22 Jul 2026
Source
LA County Department of Public Work (DPW)

ConstructChat

Ask ConstructChat about Civic Center Central Plant Refurbish

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Civic Center Central Plant Refurbish” is an infrastructure initiative in the Stadium sector, located in California, United States of America. Taiyo aggregates data on it from LA County Department of Public Work (DPW).

Participants

Not available for this record.

Status

Original status

construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Civic Center Central Heating and Refrigeration Plant supplies chilled water and steam for comfort heating and cooling to 14 buildings in the Civic Center area including the Cathedral of Our Lady of the Angels and to the Walt Disney Concert Hall. The plant also generates electricity, which is no longer economically viable. The original 1950s boilers are past their useful life and cannot be made to comply with emissions regulations. Original wooden cooling tower, chillers, electrical distribution equipment and controls require significant upgrades. This project will be executed in several phases, starting with critical equipment requiring immediate replacement. The engineering challenge is to maintain plant operations while performing the phased critical equipment replacement.

Original sector

Capital Improvement

Budget

Location

Country

United States of America (USA)

State

California

Source

Source

LA County Department of Public Work (DPW)

URL

More Details

Record type

Project

Sector

Stadium, Water Supply and Storage, Power Generation (CCGT), Government, Residential, Manufacturing (Industrial)

Article published date

2024-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project