logo

CK Apartment / rar.studio

Sector: Steel • Location: Portugal

Source: ArchDaily

Project
Closed

It occupies a building dating from the end of the 19th century, with a common typology inLisbon: built on a narrow, deep plot that originates flats with several interior divisions and a long, dark corridor between the rooms on the main and back façades.Text description provided by the architects.Apartment CK started out as a property investment project, intended for rental, but soon became a perso

Project Information FAQ

Project Information

3 Q
The project “CK Apartment / rar.studio” is an infrastructure initiative in the Steel sector, located in Portugal. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

It occupies a building dating from the end of the 19th century, with a common typology inLisbon: built on a narrow, deep plot that originates flats with several interior divisions and a long, dark corridor between the rooms on the main and back façades.Text description provided by the architects.Apartment CK started out as a property investment project, intended for rental, but soon became a personal project for our client, who decided to leave Bali forLisbon. A heaven of quiet in the vicinity of the busy Avenida da Liberdade.The street front is taken up by the master bedroom and office, and the centre of the flat is occupied by the bathrooms. At the back, the kitchen and a second bedroom communicate directly with the interior and exterior social areas of the house.With a different construction logic – a metal structure – the extension of the building at the back, after its construction date, made it possible for the existence of a large opening onto the terrace, which was redesigned with a plant border.The entrance space was narrow, and the widening of the corridor – offering a niche to the entrance – transforms this circulation device into a single, fluid and continuous space that integrates the kitchen while generously and luminously connecting the two façades. In the kitchen, the structural reinforcement pillar that this operation requires is the motto for the design of a central worktop piece in stainless steel.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data