Clairemont Mesa East Improvements 2
Sector: Water Supply and Storage • Location: San Diego, California, United States of America
Source: Dodge USA
Construction of Clairemont Mesa East Improv 2 (water and sewer) consists of the installation of approximately 15,755 LF (2.98 miles) 8-inch, 12-inch, and 16-inch water mains and the installation of approximately 1,013 LF (0.19 miles) 8-inch sewer mains, including all associated water services, fire hydrants, laterals, manholes, curb ramps, traffic control, trench restoration, pavement resurfacing,
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Clairemont Mesa East Improvements 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of Clairemont Mesa East Improv 2 (water and sewer) consists of the installation of approximately 15,755 LF (2.98 miles) 8-inch, 12-inch, and 16-inch water mains and the installation of approximately 1,013 LF (0.19 miles) 8-inch sewer mains, including all associated water services, fire hydrants, laterals, manholes, curb ramps, traffic control, trench restoration, pavement resurfacing, and all other work and appurtenances. Along Clairemont Mesa Boulevard between Diane Avenue and D... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
