logo

Clarendon Quick-Build

Sector: Automotive • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Preliminary Engineering

Clarendon Quick-Build Share this: Facebook Twitter LinkedIn Project Introduction Clarendon Quick-Build is a transportation safety improvement project along Clarendon Avenue from Johnstone Drive to Laguna Honda Boulevard. The project proposes a road diet (reducing vehicle travel lanes to one lane in each direction), safety treatments at pedestrian crosswalks, and the addition of a crosswalk and a r

Project Information FAQ

Project Information

4 Q
The project “Clarendon Quick-Build” is an infrastructure initiative in the Automotive sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

preliminary engineering

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Clarendon Quick-Build Share this: Facebook Twitter LinkedIn Project Introduction Clarendon Quick-Build is a transportation safety improvement project along Clarendon Avenue from Johnstone Drive to Laguna Honda Boulevard. The project proposes a road diet (reducing vehicle travel lanes to one lane in each direction), safety treatments at pedestrian crosswalks, and the addition of a crosswalk and a rectangular rapid flashing beacon at Dellbrook (Palo Alto Avenue). The Clarendon Quick-Build project is following behind a SF Public Works repaving project. SFMTA timeline will be dependent upon completion of repaving work. T he proposed changes use a new paint or striping to create the single lane configuration. No concrete barriers will be added to the roadway. Project Timeline Winter 2023/2024 Planning & Outreach Pending Spring 2024 Design Pending (After SF Public Works Repaving Project) *Fall 2024 Construction Pending Project Status Planning Preliminary Engineering Improvements Bus Routes and Rail Lines 36 Teresita Neighborhoods West of Twin Peaks Twin Peaks Inner Sunset Streets Clarendon Avenue Project Justification Clarendon Avenue from Ashwood Lane to Laguna Honda Boulevard is part of the 2022 High Injury Network . In San Francisco, the High Injury Network shows that 68% of severe and fatal collisions occur on just 12% of city streets. Between October 2018 and September 2023, there were seven reported injury collisions on Clarendon Avenue between Laguna Honda Boulevard and Johnstone Drive. Participatory Budgeting The SFMTA will be installing a ne w crosswalk, curb ramps, and a rectangular rapid flashing beacon (RRFB) to facilitate the trail crossing at Clarendon Avenue and Dellbrook (Palo Alto Avenue). This work is anticipated to be built before the SFPW repaving project starts. Funding for this new crosswalk and beacon is a result of the D7 2019 participatory budget process. Cross section of proposed single vehicle travel lane road configuration: Traffic speeds have been a primary factor in injury collisions on Clarendon Avenue. By installing a single lane in each direction and adding edge lines, the roadway is visually narrowed, and drivers tend to drive slower compared with similar roadways with two lanes. Right-sizing the roadway will also match the one-lane configurations that feed Clarendon Avenue on both ends: east of Johnstone Drive and at Laguna Honda Boulevard. School drop-off queue on Clarendon. September 2023 School drop-off queue on Clarendon. September 2023 Intersection of Clarendon Avenue and Christopher Drive Passenger Loading zone at the intersection of Clarendon Avenue and Panorama Drive. Contact Information ClarendonQB@SFMTA.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data