Claresholm Solar Connection DUPLICATE REPORT
Abandoned · Alberta · Last reported Jul 2020
Source: Dodge USA
Approximately 30 metres of new 138 kilovolt (kV) transmission line to connect Claresholm Solar?s proposed Granum Substation to transmission system - New transmission line will be called 180AL and will connect to AltaLink?s existing 180L transmission line - Will be operated and maintained by AltaLink - New transmission line will consist of 3 wood or steel H-frame structures approximately 14 to 25 m
- Status
- Failure
- Sector
- Power Generation (CCGT), Power Transmission, Solar, Steel, Metal, Commercial
- Location
- Claresholm, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Claresholm Solar Connection DUPLICATE REPORT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Approximately 30 metres of new 138 kilovolt (kV) transmission line to connect Claresholm Solar?s proposed Granum Substation to transmission system - New transmission line will be called 180AL and will connect to AltaLink?s existing 180L transmission line - Will be operated and maintained by AltaLink - New transmission line will consist of 3 wood or steel H-frame structures approximately 14 to 25 m tall - Will be single circuit - Will have right-of-way width of approximately 20m on private lan... |
Location
Country | Canada |
State | Alberta |
City | Claresholm |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Solar, Steel, Metal, Commercial |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Canada
- Site C Worker Accommodation
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Brock University's Marilyn I. Walker School of Fine and Performing Arts
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- Osgoode Hall Law School
- Toronto Airport Piers D and E Fixed Bridges
