logo
ProjectAbandoned

Claresholm Solar Connection DUPLICATE REPORT

Abandoned · Alberta · Last reported Jul 2020

Source: Dodge USA

Approximately 30 metres of new 138 kilovolt (kV) transmission line to connect Claresholm Solar?s proposed Granum Substation to transmission system - New transmission line will be called 180AL and will connect to AltaLink?s existing 180L transmission line - Will be operated and maintained by AltaLink - New transmission line will consist of 3 wood or steel H-frame structures approximately 14 to 25 m

Status
Failure
Sector
Power Generation (CCGT), Power Transmission, Solar, Steel, Metal, Commercial
Location
Claresholm, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Claresholm Solar Connection DUPLICATE REPORT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Claresholm Solar Connection DUPLICATE REPORT” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Claresholm, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

abandoned

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Approximately 30 metres of new 138 kilovolt (kV) transmission line to connect Claresholm Solar?s proposed Granum Substation to transmission system - New transmission line will be called 180AL and will connect to AltaLink?s existing 180L transmission line - Will be operated and maintained by AltaLink - New transmission line will consist of 3 wood or steel H-frame structures approximately 14 to 25 m tall - Will be single circuit - Will have right-of-way width of approximately 20m on private lan...

Location

Country

Canada

State

Alberta

City

Claresholm

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Solar, Steel, Metal, Commercial

Article published date

2024-02-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project