Claresholm Solar Project
Construction · Alberta · Last reported Jul 2020
Source: Dodge USA
132 MW AC solar power plant/solar farm on 880 acres on north side of Secondary Highway 520 and Range Road 130 - 470000 2m by 1.2m and 430-watt solar panels with capacity to power 33000 homes - Mounted on aluminum steel racking - New substation called Granum Substation
- Status
- Under Construction
- Sector
- Metal, Power Generation (CCGT), Raw Materials, Residential, Steel, Solar, Road, Commercial
- Location
- Claresholm, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Claresholm Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 132 MW AC solar power plant/solar farm on 880 acres on north side of Secondary Highway 520 and Range Road 130 - 470000 2m by 1.2m and 430-watt solar panels with capacity to power 33000 homes - Mounted on aluminum steel racking - New substation called Granum Substation |
Location
Country | Canada |
State | Alberta |
City | Claresholm |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Power Generation (CCGT), Raw Materials, Residential, Steel, Solar, Road, Commercial |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
