Clarifier 2 Equipment Parts Replacement
Sector: Water Supply and Storage • Location: Anderson, South Carolina, United States of America
Source: Dodge USA
All labor, tools, and equipment for the successful installation and start-up of a 60 spur gear and worm gear, a 42 spur gear and worm gear, four (4) wearing shoes, and thirty (30) stainless steel squeegees. This includes complete dewatering of the clarifier as needed during construction, the removal of the existing identical equipment and all additional work necessary for installation. Provide gea
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment, Oil and Gas, Manufacturing (Industrial), Metal
- Location
- Anderson, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Clarifier 2 Equipment Parts Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | All labor, tools, and equipment for the successful installation and start-up of a 60 spur gear and worm gear, a 42 spur gear and worm gear, four (4) wearing shoes, and thirty (30) stainless steel squeegees. This includes complete dewatering of the clarifier as needed during construction, the removal of the existing identical equipment and all additional work necessary for installation. Provide gear oil and assistance during start-up services. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Anderson |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Government, Commercial, Waste Processing and Treatment, Oil and Gas, Manufacturing (Industrial), Metal |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
