Clarifier Cathodic Protection Electrical Isolation
Sector: Metal • Location: Milwaukee, Wisconsin, United States of America
Source: Dodge USA
Work covered by these Contract Documents in general covers work on the following facilities: Primary Clarifiers (PC) No. 1 through 8 1. Remove and replace three existing metallic flexible conduits between concrete basin and PC walkway with new non-metallic flexible conduit. Work to include disconnection and removing existing conductors and reinstalling and terminating existing conductors as requir
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial
- Location
- Milwaukee, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Clarifier Cathodic Protection Electrical Isolation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work covered by these Contract Documents in general covers work on the following facilities: Primary Clarifiers (PC) No. 1 through 8 1. Remove and replace three existing metallic flexible conduits between concrete basin and PC walkway with new non-metallic flexible conduit. Work to include disconnection and removing existing conductors and reinstalling and terminating existing conductors as required for flexible conduit replacement at PC No. 1 through 8. 2. Remove and replace existing water p... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Milwaukee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
