Clarion Power Plant
Sector: Biomass • Location: Andhra Pradesh, India
Source: World Bank Group
In December 1997, Non-Conventional Energy Development Corporation of Andhra Pradesh Limited (NEDCAP) approved the development of a 12 MW biomass power plant in Prakasam district of Andhra Pradesh State by Clarion Power Corporation Limited (CPCL). In January 1998, CPCL formally entered into a memorandum of understanding with NEDCAP for the development of this project.
All the power from this proj
- Status
- Prospective
- Sector
- Biomass, Consumer Products, Power Generation (CCGT), Raw Materials, Commercial, Government, Manufacturing (Industrial)
- Location
- Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Clarion Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 1997, Non-Conventional Energy Development Corporation of Andhra Pradesh Limited (NEDCAP) approved the development of a 12 MW biomass power plant in Prakasam district of Andhra Pradesh State by Clarion Power Corporation Limited (CPCL). In January 1998, CPCL formally entered into a memorandum of understanding with NEDCAP for the development of this project. All the power from this project was supplied to APTRANSCO, the electricity transmission company for the state of Andhra Pradesh, under a long term power purchase agreement (PPA) signed in September 2003. The PPA was for an initial period of 20 years (from commercial operations date) with a possibility of renewal for an additional term upon mutual agreement by the parties. The fuel used for the plant was generally agricultural waste, including rice husk, ground nut shell and agro waste. The fuel required for the power plant was procured from farms in nearby villages under short-term contracts. CPCL, a special purpose company, was majority owned by India’s Lanco Group (86%). Information on the other promoters of CPCL was not available from public sources. The total cost of this power plant was estimated at US$ 10.1 million (Rupees 470 million). The project reached financial closure in 2003. In April 2006, CPCL signed an emission reduction purchase agreement for trading of the issued Certified Emission Reductions (CER), pursuant to the clean development mechanism (CDM), with Electricity De France Trading Limited (EDF). The project began commercial operations in January 2004. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Andhra Pradesh |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Consumer Products, Power Generation (CCGT), Raw Materials, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2024-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
