Clark College Baird Sewer Replacement
Sector: Water Supply and Storage • Location: Vancouver, Washington, United States of America
Source: Dodge
CLC - Clark College Baird Sewer Replacement includes a restricted date range to replace an existing sanitary sewer line outside the Baird Administration Building on the Clark College main campus in Vancouver, Washington. The existing sanitary sewer line may be asbestos concrete pipe.
- Status
- Closed
- Sector
- Water Supply and Storage, Education, Government, Cement, Commercial, Waste Processing and Treatment
- Location
- Vancouver, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Clark College Baird Sewer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CLC - Clark College Baird Sewer Replacement includes a restricted date range to replace an existing sanitary sewer line outside the Baird Administration Building on the Clark College main campus in Vancouver, Washington. The existing sanitary sewer line may be asbestos concrete pipe. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Vancouver |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Education, Government, Cement, Commercial, Waste Processing and Treatment |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
