Classroom Renovations
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project includes renovations of two classrooms at the main campus building and adding one new door at one of the corridors. Renovation of room E104. Located at the main level of the building. The room is to become the Sustainability Office for the College. Area: 45 m2 New flooring, ceiling, and wall finishing are required. Existing flooring, lighting fixtures, ceiling grids, and panels need to
- Status
- Closed
- Sector
- Commercial, Residential, Education, Road
- Location
- Niagara-On-The-Lake, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Classroom Renovations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes renovations of two classrooms at the main campus building and adding one new door at one of the corridors. Renovation of room E104. Located at the main level of the building. The room is to become the Sustainability Office for the College. Area: 45 m2 New flooring, ceiling, and wall finishing are required. Existing flooring, lighting fixtures, ceiling grids, and panels need to be removed and new ones will be installed. One L-shape cabinet with a countertop is needed. Reno... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Niagara-On-The-Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Education, Road |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
