Clay High School Parking Lot Renovation
Sector: Car parking • Location: Green Cove Springs, Florida, United States of America
Source: Dodge USA
The project consists of infilling and relocating the existing site retention pond, reconstructing the vehicular circulation patterns which include the entrance driveways, the front parking lot and pedestrian walkways, along with the construction of a new stadium visitor bleacher system.
- Status
- Closed
- Sector
- Car parking, Stadium, Road, Automotive, Government, Commercial
- Location
- Green Cove Springs, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Clay High School Parking Lot Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of infilling and relocating the existing site retention pond, reconstructing the vehicular circulation patterns which include the entrance driveways, the front parking lot and pedestrian walkways, along with the construction of a new stadium visitor bleacher system. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Green Cove Springs |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Stadium, Road, Automotive, Government, Commercial |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
