Clean drinking water and efficient sewage systems in Bihor County, Romania
Sector: Waste Processing and Treatment • Location: Romania
Source: European Database
Some two-thirds of the work was done in the project’s first phase, while in the second phase, the drinking water network is to be extended by 14.2 km, of which 0.97 km are in Oradea, 5.22 km are in Sântandrei and 8.01 km are in Paleu.A further 16.38 km of the network (16.14 km in Oradea and 0.24 km in Sântandrei) are to be rehabilitated, while 16.14 km of new water main is to be laid. Of this, 8.6
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Some two-thirds of the work was done in the project’s first phase, while in the second phase, the drinking water network is to be extended by 14.2 km, of which 0.97 km are in Oradea, 5.22 km are in Sântandrei and 8.01 km are in Paleu.A further 16.38 km of the network (16.14 km in Oradea and 0.24 km in Sântandrei) are to be rehabilitated, while 16.14 km of new water main is to be laid. Of this, 8.61 km are in Sântandrei and 7.53 km are in Paleu.The project also entails construction of three pumping stations (two in Sântandrei and the other in Paleu), four reservoirs (two in each of Sântandrei and Paleu) and three chlorination stations (one in Sântandrei and two in Paleu).Improved waste water collection and treatmentAs regards waste water collection and treatment, the sewer network is to be extended by 24.36 km, of which 8.07 km are in Oradea, 6.63 km are in Sântandrei and 9.66 km are in Paleu. A further 15.49 km of the network are to be renovated in Oradea.Other elements of the project include construction of 19.58 km of discharge channels (1.91 km in Oradea, 11.15 km in Sântandrei and 6.52 km in Paleu) and 17 pumping stations (seven in Sântandrei, nine in Paleu and one in Beiuș).Two waste water treatment plants are also to be built, one to serve Beiuș and the other to serve Tinca. The same two areas will benefit from the acquisition of two supervisory control and data acquisition (SCADA) systems for the monitoring of processes within the sewage network.Health and environmental benefitsOne of the main aims of the project is to ensure provision of clean drinking water for the local population, which numbers almost 250 000 people. The improvements should also help to reduce losses of water from the drinking water distribution network. Furthermore, thanks to the work over both phases, the risk of uncontrolled discharge of untreated waste water and resulting environmental pollution will be minimised.As a consequence of the extensions, an additional 22 800 people will be connected to the drinking water network and will have continuous access to good quality water, which will bring significant public health benefits. As far as the waste water part of the project is concerned, connection rates to the sewage network are expected to reach 100 % in Oradea, 98 % in Beiuș, 97 % in Tinca and 90 % in Girișu de Criș, Nojorid, Palota, Sântandrei and Tărian.Total investment and EU fundingTotal investment for the project “Extension and modernisation of water and waste water infrastructure in the Bihor County” is EUR 24 217 610, with the EU’s Cohesion Fund contributing EUR 15 458 548 through the “Large Infrastructure” Operational Programme for the 2014-2020 programming period. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
